Saturday, September 23, 2006

SWAN Song...last section for 1st shipment.





Well, things are moving along on Narrows Bridge II... NB-II. The last section was lifted of the "Swan" on Thursday as I was riding over the bridge. They've been lifting the sections at a maddening pace lately. At the Gig Harbor (west) end they're moving/swinging sections to the shoreline. In the middle they've got some 9 sections in place but very out of final setting. Until things are balanced the arch of the bridge is presently a valley, very odd looking. The "Atlantic" tug is on the job thanks to Ken Pace, and has been doing yeoman duty!
Doug

0 Comments:

Post a Comment

<< Home